Lucky Strike Gold Prospecting

Product Detail

Minelab GPZ Ground Balancing Ferrite


$20.00


Shipping: $8.50

3011-0301
Ground balancing using a ferrite means that less soil needs to be covered during the initial ground balance period.  To achieve optimum ground balance, the GPZ 7000 requires as much different data about the ground as possible, especially variations in the soil mineralisation.
Ground balancing using a ferrite means that less soil needs to be covered during the initial ground balance period because the ferrite artificially adds very useful data to assist in achieving an accurate balance.

 @ $20.00
My cart
Number of items: 0
Subtotal: $0.00 
*This is a subtotal. Shipping costs are calculated at time of checkout.

Go to checkout